ESOS savings of £1.12bn: is your portfolio inside phase 4?

ESOS savings of £1.12bn: is your portfolio inside phase 4?
Director's Risk Check: walk into your next senior management meeting with the answers. Run the free 5-minute check for UK portfolios.
Run the free 5-minute Director's Risk Check for UK portfolios →

£1.12 billion. That is the estimated energy bill saving ESOS participants stand to make over 2024 to 2037 from the changes made from the third compliance period onwards, according to the government's own figures. If your name is on the duty-holder paperwork, the question is not whether the scheme pays — it is whether your portfolio is actually inside it, and which phase you are being measured against today.

Because the answer to "what phase of ESOS are we in now?" has moved, and the rules moved with it.

The stakes: phase 4 is live, and the old shortcuts are gone

ESOS is a mandatory energy assessment scheme for large undertakings and groups containing large undertakings in the UK, established by the Energy Savings Opportunity Scheme Regulations 2014 and substantially amended in 2023. Qualifying organisations must carry out an assessment every four years covering buildings, industrial processes and transport. Phase 4 guidance now reflects the most recent amendment, the Energy Savings Opportunity Scheme Regulations 2014 as amended in 2026, and it is published by the Environment Agency as UK scheme administrator.

Two changes matter most for anyone running warehouses. First, you can no longer use Display Energy Certificates or Green Deal assessments as alternative compliance routes. Second, progress against your action plan commitments must now be included in the assessment, with an explanation where commitments have not been met. The certificate on the wall is no longer a substitute for the audit.

Director's Risk Check: walk into your next senior management meeting with the answers. Run the free 5-minute check for UK portfolios.
Run the free 5-minute Director's Risk Check for UK portfolios →

What phase of ESOS are we in now — and what date actually bites

You are in phase 4. The phase 3 compliance notification deadline of 5 June 2024 has passed, the action plan deadline of 5 December 2024 has passed, and the extension that followed has also closed. What remains is the second progress update report, due by 5 December 2026. That is the date to put in front of your board, because it is the one still ahead of you.

Two annual progress updates must be completed in the two years following the action plan deadline. If your action plan landed on time, the first update is behind you and the second is the live obligation. If your action plan was late, both updates compress into a shorter window, and the evidence you need to produce gets thinner with every month you wait.

The regulator depends on where your registered office sits. The Environment Agency covers England, Natural Resources Wales covers Wales, the Northern Ireland Environment Agency covers Northern Ireland, and the Scottish Environment Protection Agency covers Scotland. A group with a Manchester head office and a Glasgow distribution centre still answers to one regulator, but the person signing needs to know which.

Where industrial buildings fail the assessment

Warehouses and industrial units have a particular profile under ESOS, and it is not the profile of an office. Energy use splits between the building envelope, lighting, dock equipment, refrigeration where present, and the processes inside. The scheme's own post implementation review estimated annual efficiency savings of 1.65 TWh from buildings and 1.51 TWh from industrial processes, which tells you where the assessor will spend time.

Areas of significant energy consumption must cover at least 95% of total energy consumption. In a multi-site industrial portfolio, that 95% test is where the argument happens. A site with a small office block and a large unheated shed may not consume enough to justify a full audit, but it still has to be accounted for inside the boundary. The worked example in the government's Appendix C guidance shows how a group decides which areas count, and how building energy is converted and totalled across a group.

What typically goes wrong on site is simpler than the methodology. Sub-metering is incomplete, so the assessor cannot separate process load from building load. Half-hourly data exists for the electricity supply but not for gas. The site manager who knew where the isolation valves and the plant schedules were has left. The assessment then gets built on estimates, and estimates are what an explanation to the regulator is made of.

The cost of getting it wrong, and the cheaper path

The direct penalty for missing an ESOS obligation is imposed by the scheme administrator, and the government publishes a summary of penalties imposed on data.gov.uk. The knock-on costs are less tidy. An incomplete assessment weakens the energy narrative in your annual report, which sits alongside your SECR disclosure — ESOS is separate to SECR, but the same board signs both. Insurers and buyers increasingly ask for energy performance evidence on industrial assets, and a portfolio that cannot produce a current assessment invites questions at exactly the wrong moment.

The cheaper path is unglamorous. Confirm your qualification status against the large undertaking definition, confirm which regulator holds your registered office, and confirm which of your sites fall inside the 95% boundary. Then check whether the evidence behind your last assessment still exists in a form someone could hand over. The main ESOS guidance on GOV.UK sets out the qualification criteria and the four-year cycle, and it is the document to read before you brief anyone.

If you also operate in Singapore, the equivalent pressure arrives through a different statute and a different currency, which is worth understanding before you assume one playbook covers both — the comparison of Singapore's Energy Conservation Act audits against the UK scheme sets out where the duties diverge.

Your 60-second self-check

  • Can you name, today, which regulator holds your organisation's ESOS file — Environment Agency, NRW, NIEA or SEPA?
  • Could you produce the evidence behind your areas of significant energy consumption, showing they cover at least 95% of total energy use?
  • Do you know whether your second progress update report is on track for 5 December 2026, and who is writing it?

If any of those three made you reach for a folder, the free five-minute Director's Risk Check will show you which statutory deadlines and penalties apply to your portfolio, each one tied to its official source. It gives you the breach exposure in a form you can put in front of the board, and you can send it to a colleague to answer if the detail sits with them rather than you.

Herman's verdict

The Display Energy Certificate was always the comfortable answer, and phase 4 has taken it away. What is left is an audit trail that has to survive a change of site manager, a change of assessor and a change of finance director — and the directors who treat that trail as an asset, not paperwork, are the ones who never see ESOS on a board agenda as a surprise.

— Herman

Until next time — keep the evidence closer than the deadline.

H
Herman
Head of Insights, HermanWa

Walk into your next senior management meeting with the answers

The free Director's Risk Check for UK portfolios takes five minutes. No sign-up to see your score.

  • Your control score across compliance, evidence, oversight, cost and renewals
  • The breach exposure in your portfolio, with the official source for each penalty
  • A board-ready briefing with your three priorities and a 30/60/90-day plan
Run the 5-minute check

About HermanWa

HermanWa is a building compliance and operations platform for property and facilities teams in the United Kingdom and Singapore, with portfolios across the Gulf. It keeps one auditable file per building — statutory deadlines, inspection evidence, contractor work, energy and carbon — and its AI assistant, Herman, answers questions about your buildings in plain English. HermanWa tracks obligations including fire risk assessments and fire door checks, Building Safety Act duties, Legionella (ACOP L8), EICR, gas safety and EPC in the UK, and SCDF fire certificates, Periodic Facade and Structural Inspections, lift permits and Green Mark in Singapore. Directors can check their exposure with the free Director's Risk Check.